Risk & contingency · FTA OP 40C / FRA MP 40c

The risk module nobody can ignore.

Tornado, distribution, scatter and patent-versus-latent contingency graphs, thirty-six in all, built on a live simulation of Standard Cost Categories, Beta Range Factors and a risk register. Watch uncertainty turn into a number you can fund.

36animated graphs: 10 tornado, 10 distribution, 10 scatter, 6 patent & latent
2500Latin Hypercube trials behind every picture
8Standard Cost Categories modeled, SCC 10 through 80
P50 · P65 · P80confidence levels reported, as in FTA OP 40C
Standard Cost Categories

Ten categories. Eight carry the risk.

The cost estimate is organized into Standard Cost Categories. Each one gets a lower bound, its Adjusted Cost Estimate, and an upper bound set by a Beta Range Factor. A Beta distribution between the two becomes that category’s risk curve, and the categories add up to project-level risk. Select a category.

    Upper bound = Beta Range Factor × Lower bound
    BRF = 1.05 base + Requirements + Design + Market + Construction risk factors

    The 1.05 base allows a 5% end-of-project range, because some risk remains even at the end of construction. Dollar figures and BRFs on this page belong to an invented illustrative project and are not client data.

    RISK CATEGORIES

    Four ways a number can move

    • Requirements. Goals and conditions the design must answer to, including stakeholders and regulators. Runs from concept through Alternatives Analysis.
    • Design. Performance and variability of design work after Alternatives Analysis. Substantially complete when 95% of construction direct cost is on both the deliverables and the estimate.
    • Market. Pricing of services, materials and equipment, plus the effect of contract packaging.
    • Construction. Weather, ground, contractor failure and manageable performance risk, split into early, mid and late ranges.
    STANDARD FACTORS · SCC 10–50

    How the range tightens

    • Design risk in preliminary engineering: 0.35
    • Design risk in final design: 0.25
    • Market risk: 0.25
    • Construction risk: 0.45 (early 0.25, mid 0.15, late 0.05)
    • Post construction: 0.05
    • Requirements risk: case by case
    Contingency by milestone

    Generalized minimum contingency levels

    MilestoneMinimum contingencyReading
    Planning & concept complete30–40%Requirements and design risk still dominate.
    Preliminary engineering complete20–30%Assumes a minimum 30% design completion.
    Ready to procure construction15–20%Design risk is largely retired. Market risk is next.
    Start of construction10–15%Bid price known. Early construction risk ahead.
    50% physically complete5–7%Late construction and unknowns remain.

    Levels reflect historic risk under design-bid-build delivery. Design-build and other delivery methods can transfer design and market risk, so each project’s contract needs its own review. The levels can be interpolated between milestones.

    The Risk Lab

    Thirty-six graphs. One simulation.

    Tornado graphs show what drives the answer. Distribution graphs show the answer itself. Scatter plots show how the pieces move together. Patent and latent graphs separate the risks you can name from the ones you cannot yet see. Replay any graph with ↻, or present it full screen with ⤢.

    Every graph is drawn from one illustrative model: eight cost categories, six schedule activities and a twelve-event risk register, sampled 2,500 times with Latin Hypercube. The project is invented. Nothing here is client data.

    The method, step by step

    Monte Carlo, Latin Hypercube & OP 40C

    Every chart in this section is a live simulation of a made-up example project (8 cost items, 7 schedule activities, 5,000 trials). It shows our method, not a client result.

    From “what if” to a number you can fund

    A single-point estimate says the project costs 100. Reality is a range. We model each cost item and schedule activity as a range, run thousands of trials, and report the confidence level the owner chooses to fund.

    Input distributions

    Triangular vs. PERT shape for one uncertain cost item

    Illustrative example

    What we deliver

    • Quantitative and qualitative risk analysis and risk register
    • Cost contingency curve with minimum contingency levels
    • Beta Range Factor assessment, forward pass and backward pass
    • Contingency drawdown and risk trend analysis reports
    • Design, market and construction risk, and adequacy of budget and schedule
    • SCC cost workbook conditioning